WW
WANG Wei BIM Manager & VDC Lead
Singapore Civil Construction & Digital Delivery

Elevating Construction with Digital Twins & BIM

BIM Manager with 20 years of Civil Infrastructure experience and 10 years leading strategic BIM & VDC workflows across Singapore's landmark Mega Transit, Tunneling, and Highway developments.

20+
Years Construction Exp.
15+
LTA & Public Projects
BCA
BIM & VDC Specialist

WANG Wei

BIM Manager @ Samwoh

Singapore
Specialist Diploma in BIM & VDC - BCA Academy Singapore
BCA iBEFP Trainer for Revizto (Digital Coordination)
Synchro Certified User (4D Virtual Construction)
University of Science and Technology of China (USTC)

Core Expertise

End-to-End Digital Engineering Capabilities

From tender animation and parametric design to on-site reality capture and 4D schedule simulation.

4D Virtual Construction & Simulation

Linking time schedules (Primavera P6 / MS Project) with 3D geometries using Synchro 4D to identify spatial clashes, optimize staging, and de-risk complex logistics.

Synchro 4D Logistics Staging Risk Mitigation

Reality Capture & Laser Scanning

LiDAR terrestrial laser scanning and drone photogrammetry for accurate as-built verification, terrain modeling, and underground utility clash resolution.

Point Cloud Drone Survey As-Built QA/QC

Construction Animation & Visuals

High-impact 3D animation videos for LTA/URA tenders, technical method statements, traffic diversion schemes, and executive stakeholder reviews.

3ds Max ArchViz Tender Presentation

Model Coordination & Clash Resolution

Leading multidisciplinary coordination across C&S, MEP, Architectural, and Rail Systems using Revizto and Navisworks to preempt on-site rework.

Revizto Navisworks BIM Standards (ISO 19650)

360° Site Tours & Immersive XR

Deploying AR/VR/MR and 360° virtual site inspections for digital walkthroughs, remote site meetings, progress verification, and client alignment.

360 Tour AR/VR/MR Digital Twin

BIM Analytics & 5D Quantity Takeoff

Extracting reliable quantity takeoffs directly from BIM models and coupling with Microsoft Power BI dashboards for real-time progress and cost insights.

Power BI QTO Analysis Civil 3D / Revit

Featured Work & Gallery

Visualizing Digital Engineering

Explore key delivery disciplines captured across Singapore's major infrastructure contracts.

Construction Animation
3D Simulation

Construction Animation

Dynamic visualization of complex construction sequences, earth retention, and structural methodologies.

Method Statement Staging
4D Animation
Synchro 4D

4D Animation & Planning

Synchronizing baseline schedules with spatial geometries to reveal temporal bottleneck challenges.

Time-Space Clash Detection
Model Coordination
Revizto / Navisworks

Model Coordination (C&S / MEP)

Multidisciplinary federated model clash detection, issue tracking, and constructability reviews.

Zero Rework Objective
Laser Scanning
LiDAR Terrestrial

Laser Scanning (Reality Capture)

High-definition point cloud survey of existing utilities, MRT depot structures, and clearance audits.

Millimeter Accuracy
Drone Photogrammetry
Aerial Survey

Drone Photogrammetry

UAV photogrammetric 3D surface mesh generation for earthwork cut-and-fill and highway corridor mapping.

Site Topography & Orthomosaic
Photogrammetry
Digital Modeling

Structural Photogrammetry

High-density mesh reconstruction for site conditions, civil inspection, and structural documentation.

Visual Condition Records
ArchViz
CGI & Rendering

ArchViz & Visual Storytelling

Photorealistic architectural rendering and aesthetic asset preparation for high-stakes presentations.

Executive Communications
360 Photo Tour
Virtual Walkthrough

360° Photo Site Tour

Panoramic image tours tied to floor plans for remote site progress verification and safety audits.

Site Tele-presence
AR / VR / MR
Spatial XR

AR / VR / MR Immersive Tech

Augmented reality on-site overlay and virtual reality safety walk-throughs for digital transformation.

Interactive Site Overlay

Watch High-Resolution Demos on YouTube

Explore complete 4D sequence animations, site fly-throughs, and methodology videos.

Watch Online

Track Record

Landmark Singapore Infrastructure

Direct BIM management, 4D modeling, and tender animation contribution across top public authority works.

LTA · DTL2e MRT
2026 - Present

DTL2e 990 Sungei Kadut Interchange Station

Design & construction of Singapore's key DTL2e interchange linking elevated NSL with underground Downtown Line stations, spearheading strategic BIM/VDC management, deep ERSS, and critical civil interfaces.

Client: LTA Interchange DTL2e
LTA · CRL MRT
2021 - 2022

CRL CR116 Ang Mo Kio MRT Interchange

BIM Manager for the Cross Island Line interchange with existing North-South Line. Coordinated deep excavation, underpinning, ERSS, and civil phasing.

Client: LTA Gammon Interchange
LTA · Expressways
2024

DE151 & DE182 Changi Corridors

Changi Southern & Northern Corridor arterial expansion, viaducts, road diversions, and comprehensive utilities realignment modeling.

Client: LTA Samwoh Corridors
URA · Urban Connector
2024 - Present

URA Bishan-to-City PIE Link

Pedestrian and cycling connectivity over the Pan Island Expressway. Complex steel truss erection sequencing, crane radius simulations, and traffic closure animations.

Client: URA Pedestrian Link 4D Rigging
LTA · TEL MRT
2015 - 2018

TEL T221 Havelock & T210 Mayflower Stations

Thomson-East Coast Line underground metro stations. Full BIM lifecycle coordination, mined tunnel interfaces, shaft construction, and station box coordination.

Client: LTA Underground Civil 3D / Revit
SDC · Attraction
2016 - 2021

Sentosa Sensoryscape & Global Switch

Multisensory experiential canopy walkway at Sentosa; Tier IV High-density Data Center in Woodlands. Complex MEP services, diagrid structural geometry, and acoustic models.

Client: SDC / GS Data Center Geometries
Additional Major Contracts: C1761 & C1750 Bishan & Ulu Pandan Depots A&A DE159 Lim Chu Kang DE176 Serangoon / Tampines ER489 PIE Exit & Underpass RC133 Road Infrastructure Neste Expansion URA Mole Phase I & II Grace Assembly Church

Career Milestones

20 Years of Growth in Civil Engineering

2023 - Present Current Role

BIM Manager

Samwoh Corporation Pte Ltd · Singapore

Leading the corporate BIM strategic roadmap, civil digital delivery, highway corridor modeling (DE151, DE182), tender 4D simulations, reality capturing, and staff mentoring.

2021 - 2022

BIM Manager (LTA CR116 AMK Interchange)

Gammon Construction Limited · Singapore

Spearheaded the BIM division for the landmark Cross Island Line CR116 mega-contract. Managed federated models across civil, structural, architectural, and M&E systems.

2017 - 2021

Project BIM Engineer / BIM Engineer

Gammon Construction Limited · Singapore

Delivered 3D modeling, laser scanning audits, and 4D virtual simulation for Thomson-East Coast Line MRT Stations (Havelock T221, Mayflower T210) and Sentosa Sensoryscape.

2007 - 2017

Senior Draftsman & Draftsman

Gammon Construction Limited · Singapore

Over a decade of hands-on civil structural shop drawing production, depot expansion works (Bishan & Ulu Pandan), and underground obstruction removal (URA Mole I & II).

2005 - 2007

Engineering Draftsman (MRT Platform Screen Doors)

Aceplp.com Pte Ltd · Singapore

Produced detailed mechanical models & drawings for Westinghouse MRT Platform Screen Door (PSD) systems across Singapore NEL, Beijing Line 5, Shanghai Line 1, and Guangzhou Line 4.

Let's Connect & Collaborate

Whether you want to discuss BIM strategies, 4D simulation, reality capturing consulting, or infrastructure delivery, feel free to reach out.